Origins of Elko, the mechanical unit of Riga is founded, for the purpose of electrification of Riga suburbs (within Jelgava PMK).
Elko – is a Latvia based limited liability company with more than 25 years of experience in the field of electric material supply, material assembly, project management and design of electrical installations. During 25 years of conducting business, we have established cooperation with more than 250 manufacturers all over the world, successfully representing them in Latvian market. Since year 1997, when we completed our first material delivery of overhead line materials, we have steadily grown the variety of materials that we can offer to full range of both energy distribution and transmission materials as well as instruments and equipment.
Our long-term experience in design, material supply and construction opened a new business niche to us that we have implemented recently – managing and supervising large “Turn key” projects, for example: project of Latvian National interests, “Estonian – Latvian Third 330 kV Interconnection, 330 kV power transmission line construction and 110 kV power transmission line reconstruction (2018-2020).
Origins of Elko, the mechanical unit of Riga is founded, for the purpose of electrification of Riga suburbs (within Jelgava PMK).
First office building.
SIA “Elko” is founded, carrying out energy distribution construction works.
First notable energy construction project of Elko – city construction – Samara, Russia.
Elko expands with the addition business unit: wholesale/supply of electric materials.
Elko expands by starting a design business unit (more about design here).
Introduction of Quality control system and obtaining of ISO 9001 Certificate.
Elko begins the construction of telecommunication base stations.
To enter the market of high voltage works, a joint venture is being established together with Electrical assembly company from Finland “Empower”.
A unique project is developed and implemented. In cooperation with Belgian lighting manufacturer Schreder, Elko developed the design and technical solution of luminaire “Vecrīga”, first 226 pieces are supplied.
Within the reconstruction works of airport, Elko supplies lighting towers and luminaires.
The new office building of Elko.
The company goes through restructuration, with construction business unit being sold and focusing resources on the wholesale of electrical materials, project management and electrical installation design.
330 kV cable supply to the power transmission line “TEC-1 – Imanta”.
Supply of 330kV/125MVA autotransformer to substation “Brocēni”.
Subsidiary SIA “TECNOLINES” is established, renewing the construction business unit in the form of self-sustaining company, to perform low voltage, medium voltage and high voltage assembly works.
Elko wins the Tender “Supply of Smart electricity meters and PLC data concentrators” and the first smart electricity meters in Latvia are being supplied within the project.
SIA “TECNOLINES” is renamed SIA “ECC Latvija”.
Construction of substation “Stīpnieki” and 110 kV cable line, delivering and installing of the first monotubular cable tower in Latvia.
Elko acquires ISO 14001 environment management system certificate.
Elko in cooperation with companies “Selpol S.A.” and “Leonhard Weiss OU” creates a general partnership “EE – LV Interconnection” and acquires rights to carry out the constriction of Estonian – Latvian Third Interconnection 330 kV, 330 kV power transmission line construction and reconstruction of 110kV power transmission line.
Supply of more than 330 pieces of Schreder LED luminaires within the project “Highway A10 Rīga – Ventspils part km 13.41 – 19.25 reconstruction.
Supply of two 110/21/10kV 40MVA transformer to substation “Daugavpils”.
The first phase of a turnkey project – development of residential building complex “Apiņi”, has been initiated
Reconstruction of Madona City Secondary School building complex and stadium located at Valdemāra Boulevard 6, Madona. Installation of masts manufactured by SIA “Tecnopali North Europe” and GMR ENLIGHTS SRL floodlights have been performed
110/21/6.3kV 10/10/10 MVA transformer delivery for substation “Vangaži”
Origins of Elko, the mechanical unit of Riga is founded, for the purpose of electrification of Riga suburbs (within Jelgava PMK).
First office building.
SIA “Elko” is founded, carrying out energy distribution construction works.
First notable energy construction project of Elko – city construction – Samara, Russia.
Elko expands with the addition business unit: wholesale/supply of electric materials.
Elko expands by starting a design business unit (more about design here).
Introduction of Quality control system and obtaining of ISO 9001 Certificate.
Elko begins the construction of telecommunication base stations.
To enter the market of high voltage works, a joint venture is being established together with Electrical assembly company from Finland “Empower”.
A unique project is developed and implemented. In cooperation with Belgian lighting manufacturer Schreder, Elko developed the design and technical solution of luminaire “Vecrīga”, first 226 pieces are supplied.
Within the reconstruction works of airport, Elko supplies lighting towers and luminaires.
The new office building of Elko.
The company goes through restructuration, with construction business unit being sold and focusing resources on the wholesale of electrical materials, project management and electrical installation design.
330 kV cable supply to the power transmission line “TEC-1 – Imanta”.
Supply of 330kV/125MVA autotransformer to substation “Brocēni”.
Subsidiary SIA “TECNOLINES” is established, renewing the construction business unit in the form of self-sustaining company, to perform low voltage, medium voltage and high voltage assembly works.
Elko wins the Tender “Supply of Smart electricity meters and PLC data concentrators” and the first smart electricity meters in Latvia are being supplied within the project.
SIA “TECNOLINES” is renamed SIA “ECC Latvija”.
Construction of substation “Stīpnieki” and 110 kV cable line, delivering and installing of the first monotubular cable tower in Latvia.
Elko acquires ISO 14001 environment management system certificate.
Elko in cooperation with companies “Selpol S.A.” and “Leonhard Weiss OU” creates a general partnership “EE – LV Interconnection” and acquires rights to carry out the constriction of Estonian – Latvian Third Interconnection 330 kV, 330 kV power transmission line construction and reconstruction of 110kV power transmission line.
Supply of more than 330 pieces of Schreder LED luminaires within the project “Highway A10 Rīga – Ventspils part km 13.41 – 19.25 reconstruction.
Supply of two 110/21/10kV 40MVA transformer to substation “Daugavpils”.
The first phase of a turnkey project – development of residential building complex “Apiņi”, has been initiated
Reconstruction of Madona City Secondary School building complex and stadium located at Valdemāra Boulevard 6, Madona. Installation of masts manufactured by SIA “Tecnopali North Europe” and GMR ENLIGHTS SRL floodlights have been performed
110/21/6.3kV 10/10/10 MVA transformer delivery for substation “Vangaži”